Electrical installation works at Cold Storage Complex were carried out by AKFA Elektrik specialists.

Scope of work

  • Preparation of installation drawings
  • Commissioning of two 2500 kVA 10 kV/0.4 kV transformers
  • Laying of 10 kV and 0.4 kV cables
  • Installation of 0.4 kV main distribution panels
  • Commissioning of 1000 kVA and 450 kVA generators
  • Low-voltage distribution installation
  • Lighting and socket installation
  • Cable tray systems
  • Installation of fire detection and alarm systems
  • Installation of CCTV systems
  • Satellite TV distribution system